Former Hospital Site, Colindale, Phase 2

ClientFairview New Homes
Cost£21m

BM3 Architecture was appointed in 2012 to carry out post planning working drawings for 2no apartment blocks comprising 198 dwellings with a mix of studio, 1, 2 & 3 bedroom apartments. The two blocks are part of the second phase of the master-planned development. The initial phase which includes an energy centre comprises over 500 dwellings. The completed site will provide the area with over 900 new homes.

The buildings are between 4 and 7 storeys in height, with the construction utilising a reinforced concrete frame together with a traditional masonry building envelope. Each block benefits from a podium deck which provides communal amenity space for all residents. Undercroft car parking is located beneath the podium deck.

BM3 Architecture was appointed in 2012 to carry out post planning working drawings for 2no apartment blocks comprising 198 dwellings with a mix of studio, 1, 2 & 3 bedroom apartments. The two blocks are part of the second phase of the master-planned development. The initial phase which includes an energy centre comprises over 500 dwellings. The completed site will provide the area with over 900 new homes.

The buildings are between 4 and 7 storeys in height, with the construction utilising a reinforced concrete frame together with a traditional masonry building envelope. Each block benefits from a podium deck which provides communal amenity space for all residents. Undercroft car parking is located beneath the podium deck.